Combined Cycle Power Plant Mittelsbüren (Germany)

In detail

 

Bremen, Germany, 2012

Excavation, civil works and erection of the circulating water pipe of the plant, excavations inside sheet piles until -7 meters, especial foundations for auxiliary rack, block foundations in elbows of the concrete pipe against water hammer, supply, prefabrication and erection of concrete and steel framework.

Images

Back to Top